A steep backyard is hard to use. Tiered retaining walls, also called terraced walls, turn a slope into a series of flat levels for lawns, gardens, play areas and entertaining.

Why tier instead of one tall wall?

The spacing rule that matters

An upper wall placed too close to a lower wall adds its load to the lower one, so both behave like one tall wall. As a common rule of thumb, the horizontal gap between tiers should be at least twice the height of the lower wall to avoid loading it, but the engineer sets the actual spacing for your soil. Exempt development rules in NSW also have separation requirements between retaining walls, so spacing affects approvals too.

Designing the levels

  1. Survey the slope and decide what each level is for.
  2. Balance cut and fill so you remove as little soil as possible.
  3. Plan access: steps between tiers, paths and wheelbarrow or mower access.
  4. Plan drainage for every tier, with water directed to a lawful outlet.

Steps and paths

Steps can be built into the walls in sandstone blocks, concrete or sleeper treads. Keep rises and goings comfortable and consistent, and add handrails where heights require them.

Drainage for tiered walls

Each wall needs its own ag pipe and aggregate. Without it, water from the upper terraces saturates the lower walls. Surface water on each level should also be directed away from wall faces.

Materials for tiered walls

Terracing your slope

We design and build tiered walls across Sydney, from simple garden terraces to engineered multi-level walls on steep blocks.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

How far apart should tiered retaining walls be?

A common rule of thumb is at least twice the height of the lower wall, so the upper wall does not load it. Your engineer sets the actual spacing.

Are tiered walls cheaper than one tall wall?

Often, because lower walls need lighter footings and may have simpler approvals, but it depends on the site.

Do tiered retaining walls need drainage on every level?

Yes. Each wall needs its own drainage, or water from upper levels will saturate the lower walls.