Concrete sleeper retaining walls, also called cement sleeper walls, are now the most popular retaining wall in Sydney. They combine the speed of a sleeper wall with the durability of concrete, and come in finishes that look like timber, stone or smooth concrete.
How a concrete sleeper wall works
Reinforced precast concrete sleepers slot between galvanised steel posts set in concrete footings. The sleepers hold back the soil; the posts carry the load into the ground. Ag drainage and gravel behind the wall relieve water pressure.
Finishes
- Timber-look: woodgrain texture in greys and browns.
- Stone-look: ledgestone or sandstone textures.
- Smooth: a clean modern finish, often painted or left natural.
Why they are so popular
- Will not rot or be eaten by termites.
- Low maintenance.
- Fast to install compared with block or stone.
- Mid-range cost with a long life.
- Suits boundaries, terraces and garden beds.
What separates a good wall from a cheap one
Post size and galvanising
Heavier H and C posts for taller walls, hot-dip galvanised to resist corrosion at ground level.
Footings
Concrete footings deep and wide enough for the wall height, soil type and slope. Shallow footings are the main reason sleeper walls lean.
Drainage
Ag pipe, clean aggregate and geofabric behind every wall, discharging to a lawful outlet.
Sleeper quality
Sleepers rated for the span and height, with reinforcement suited to the load.
Heights and approvals
In NSW, low walls up to 600mm can be exempt if they meet the rules. Taller walls usually need a Complying Development Certificate or Development Application, and engineering. See council approval for retaining walls in NSW.
Fences on top
Many sleeper walls run along boundaries with a fence above. The fence posts need to be fixed properly, not just bolted to sleepers. See fences on retaining walls.
Concrete sleeper walls by METCON
Every wall we build has galvanised posts sized for the height, proper footings and full drainage. For prices, see our retaining wall cost guide.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Are concrete sleepers better than timber?
For most walls, yes. They do not rot or suffer termite damage and last much longer, for a moderate extra cost.
How high can a concrete sleeper wall be?
Height depends on post size, footing depth and engineering. Taller walls need an engineer and usually council approval.
What is a cement sleeper retaining wall?
The same as a concrete sleeper wall: precast reinforced concrete sleepers between steel posts.