Search for retaining wall blocks and you will find two very different products. Choosing the right one depends on how high the wall is, how much load it carries and the look you want.
1. Reinforced core-filled block walls (besser blocks)
Hollow concrete blocks are laid in mortar on a reinforced concrete footing. Steel bars run up through the hollow cores, which are filled with concrete. The result is a solid reinforced concrete wall.
- Best for: taller walls, driveways, boundaries, basements and tight spaces.
- Finish: rendered and painted, clad in stone or tiles, or face block.
- Needs: engineering for most walls, waterproofing where the wall backs onto living space.
2. Segmental retaining wall blocks
Interlocking concrete blocks stacked without mortar, each course set back slightly from the one below. Small walls rely on the blocks' weight; taller walls use geogrid layers laid into the compacted soil behind to tie the wall in.
- Best for: garden walls, terraces and curved walls.
- Finish: split-face textures in a range of colours.
- Needs: a compacted base, drainage aggregate behind, and geogrid design for taller walls.
Which should you choose?
| Situation | Better choice |
|---|---|
| Tall wall, little space | Core-filled block |
| Wall beside a driveway or carrying vehicles | Core-filled block |
| Curved garden wall | Segmental blocks |
| Series of low terraces | Segmental blocks |
| Wall against a house or basement | Core-filled block with waterproofing |
Footings and drainage
Both systems fail when the base is poor or water builds up behind them. Every block wall needs a properly prepared footing or base, ag pipe, clean aggregate and geofabric behind it.
Common mistakes
- Core-filled walls built without enough steel, or cores not fully filled.
- Segmental walls built too tall without geogrid.
- No drainage, so water pressure pushes the wall over.
- Rendering over a wall that backs onto wet soil without waterproofing, causing staining.
Block retaining walls in Sydney
We build both systems and recommend the one that suits your site. See also retaining wall design basics.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
What is a besser block retaining wall?
A wall of hollow concrete blocks laid on a reinforced footing, with steel bars in the cores and the cores filled with concrete.
Do segmental block walls need engineering?
Low walls may not, but taller walls usually need geogrid reinforcement designed by an engineer.
Which block wall is stronger?
A properly reinforced, core-filled block wall is generally stronger and suits taller or heavily loaded walls.