METCON Meteora Constructions
Call 0415 840 500 Open 7 days, 7am to 7pm
Terraced concrete sleeper retaining wall with landscaped garden beds, Sydney

Sydney's Most Trusted
Retaining Wall Specialists


Licensed structural builder for residential and civil projects across Sydney.

5.0 from Sydney homeowners · Free on-site quote

Licensed Builder 384697CBuilding Practitioner Unrestricted License BUP4254812Fully Insured40+ Years ExperienceSatisfaction GuaranteeCivilResidential

Request Your FREE Quote Now!

We'll call you back today. Quotation ready in 24 hours.

No obligation. The builder calls you back today.

NSW Builder Licence 384697C · DBP Registered · Fully Insured

Sydney's Retaining Wall Specialists

Looking for a retaining wall in Sydney? Meteora Constructions builds durable, structurally sound retaining walls that manage slopes, prevent erosion and add lasting value to your property. We are licensed builders, not landscapers.

Whether you are dealing with a sloping block, replacing an old wall, or levelling your land for landscaping, we deliver engineered, council-compliant results that stand the test of time. From concrete sleepers to natural sandstone, we handle every project with care and precision.

Give us a call now or submit a form. We will call you back today with the next steps and organise your free site assessment.

Free Site Assessment by the Builder Free, Detailed Quotation within 24 hours Completely Insured and Licensed Builder
Terraced concrete sleeper retaining walls with planting

What Happens Next

1

Call or Enquire

Talk directly with the builder, Constantine.

Ask questions, discuss concerns, organise an inspection.

2

Free Site Assessment

Constantine inspects your site and gives expert advice on the spot.

40+ years of hands-on experience across Sydney.

3

Written Quote in 24 Hours

Itemised quotation with a full breakdown of costs and materials.

Includes guidance on engineer and council requirements.

Retaining Wall Services We Offer Across Sydney

What Our Clients Say

★★★★★ 5.0 from homeowners and builders across Sydney
★★★★★

"METCON replaced our failing timber wall with concrete sleepers. Straightforward quote, tidy site, and it looks fantastic."

Sarah Mitchell, Mosman

★★★★★

"Council approval sorted, engineering sorted, wall done in a week. Could not fault the process."

David Reeves, Manly

★★★★★

"We got three quotes. METCON was not the cheapest but was clearly the most thorough. Worth every dollar."

Karen Lawson, Bondi Junction

★★★★★

"Our sandstone wall was crumbling and the whole garden was sliding. Constantine came out the next day, explained everything clearly, and the new wall is rock solid."

James Thornton, Dee Why

★★★★★

"We needed a large gabion wall for a steep commercial block. Engineered, certified, and done on time. Professional from start to finish."

Anthony Moretti, Parramatta

★★★★★

"I called three builders and METCON were the only ones who actually came to look at the site before quoting. Honest pricing, no surprises."

Lisa Chen, Randwick

★★★★★

"Timber retaining wall for our backyard garden beds. Neat, well-drained, and exactly what we asked for. The crew cleaned up every day before they left."

Rachel Nguyen, Coogee

★★★★★

"They handled the DA, the engineer, and the build. We didn't have to chase council once. Massive wall, done in under two weeks."

Michael Stavros, Vaucluse

★★★★★

"We're a strata block and needed a retaining wall replaced urgently. METCON moved fast, communicated well, and the residents are very happy."

Priya Sharma, North Sydney

★★★★★

"Had a concrete sleeper wall built along our driveway. Perfectly level, well-finished, and the drainage is spot on. No more water pooling."

Tom Henderson, Double Bay

★★★★★

"Our neighbours recommended METCON and now we know why. Reliable, fair price, beautiful sandstone wall. Would use them again without hesitation."

Emma & Daniel Park, Neutral Bay

★★★★★

"Two-tier sleeper wall on a steep slope. Other builders said it was too hard. METCON got it done, engineered and council-approved."

George Papadopoulos, Epping

Why Choose Meteora Constructions

Licensed Builder 384697C

Design Practitioner Builder BUP4254812 (All Class Licence)

Certified Drainage and Waterproof

Council-Compliant, Assistance with Council DA/CDC

Engineered Certified

Engineers, Architects and Surveyors Part of Our Team

40 Years Experience in Sydney, Expert Advice

Free Site Assessment and Detailed Quotation within 24 hours

Satisfaction Guarantee + 10 Year Liability Period

Civil and Residential Projects

Frequently Asked Questions

Do I need council approval to build a retaining wall in Sydney?

It depends on the height and location. As a general guide in NSW:

Under 600mmUsually exempt, no approval required.
600 to 900mmMay need a Complying Development Certificate (CDC) or DA depending on your local council.
Over 900mmAlmost always requires a DA, structural engineering drawings, and potentially a geotechnical report.

Rules vary between councils, so we always check the specific requirements for your area.

How much does a retaining wall cost in Sydney?

Costs vary based on the wall type, height, length, site access, and soil conditions. As a rough guide for 2026:

Timber sleeper$250 to $450/sqm
Concrete sleeper$400 to $700/sqm
Sandstone$600 to $1,200/sqm
Engineered reinforced concrete$800 to $1,500+/sqm

Additional costs may include excavation, drainage, engineering certification, and council fees. Contact us for a free, accurate quote for your specific project.

What type of retaining wall is best for my property?

The best type depends on your site conditions, height requirements, soil type, budget, and the look you want.

  • Concrete sleeper most popular in Sydney for durability and range of finishes.
  • Timber cost effective for low walls.
  • Sandstone suits heritage areas and natural landscapes.
  • Gabion great for drainage heavy sites.
  • Engineered reinforced concrete required for walls over 600mm or near boundaries.

We can advise on the best option during a site visit.

How long does it take to build a retaining wall?

A standard residential retaining wall typically takes 3 to 10 working days, depending on the length, height, site access, and whether excavation or engineering is involved.

Larger or more complex walls with council approvals may take longer due to the approval process, which can add 4 to 8 weeks. We provide a realistic timeline with every quote.

Are you insured, and is the work guaranteed?

Absolutely. METCON is a fully licensed NSW builder and every project is backed by comprehensive coverage:

Builder Licence384697C, DBP Registered
Public Liability$20 million coverage
Workers CompFull workers compensation insurance
HBCFHome Building Compensation Fund cover where applicable

All residential work is protected by NSW statutory warranties: 6 years for major defects and 2 years for other defects. Every wall is engineered and built to code.

Do you handle council applications and engineering?

Yes. We manage the entire approval process on your behalf, including Development Applications (DA), Complying Development Certificates (CDC), structural engineering drawings, and certification. You do not need to deal with council directly.

What areas of Sydney do you service?

We service all suburbs across Greater Sydney, from the Northern Beaches and North Shore to the Eastern Suburbs, Inner West, Western Sydney, and the Sutherland Shire. If you are unsure whether we cover your area, give us a call and we will confirm.

Can you replace or repair an existing retaining wall?

Yes. We regularly replace failing or damaged retaining walls. This includes removing the old structure, assessing the site conditions, and building a new engineered wall to current standards. We can also repair walls where the structure is still sound but requires attention.

Do I need drainage behind my retaining wall?

In almost every case, yes. Proper drainage is critical to the longevity of a retaining wall. We install agricultural drainage lines, gravel backfill, and weep holes as standard on every build. Poor drainage is the number one cause of retaining wall failure.

How do I get a free quote?

Simply call us on 0415 840 500 or fill out the quote form on this page. Constantine, the builder, will arrange a free site assessment at a time that suits you. You will receive a detailed, itemised written quotation within 24 hours of the visit.

Call Sydney's Retaining Wall Experts Today!

Call 0415 840 500

If you need a retaining wall built or replaced anywhere across Sydney, our team is ready to help. We provide free quotes, clear advice, and professional installation across all retaining wall types.

Whether you are dealing with a sloped block, replacing a damaged wall, or creating more usable outdoor space, we will guide you through the process and deliver a retaining wall built for long-term performance.

Free Site Assessment Free, No-Obligation Quote Fully Insured, Licensed Builder
Servicing: Greater Sydney Eastern Suburbs Northern Suburbs and Beaches

Request Your FREE Quote Now!

We'll call you back today. Quotation ready in 24 hours.

No obligation. The builder calls you back today.

NSW Builder Licence 384697C · DBP Registered · Fully Insured

CALL NOW GET QUOTE