Making a retaining wall that lasts is mostly about the parts you cannot see when it is finished. Here is how a builder does it, step by step, and where DIY walls usually go wrong.

1. Site assessment

Measure the levels, check the soil, find services such as stormwater, sewer, gas and power, and look at access for machines and spoil removal. Decide what the wall must hold back, including any driveway, fence or building above it.

2. Design and approval

Choose the wall type and get engineering and council approval where needed. Low walls up to 600mm can be exempt in NSW if they meet the rules. See council approval.

3. Set-out

Peg out the wall line and heights, check boundaries, and agree drainage outlet points.

4. Excavation

Cut the slope back to allow room for the wall, footings and drainage zone. Remove spoil from site. On steep sites, excavate in stages so the cut stays stable.

5. Footings or base

6. Build the wall

Install sleepers, lay blocks, place gabion baskets or fix reinforcement and pour, checking level and alignment as you go.

7. Drainage

Lay ag pipe at the base behind the wall, falling to the outlet. Line the drainage zone with geofabric and backfill with clean aggregate. Install weep holes where the wall type needs them.

8. Backfill and compaction

Backfill in layers, compacting each one. Dumping all the fill at once and compacting the top only leads to settlement and extra pressure.

9. Finishing

Capping, surface drainage at the top of the wall, topsoil and planting, and any fence on top.

Where DIY walls go wrong

DIY can suit a low garden edge. For anything that retains real soil, or sits near a boundary, driveway or building, a licensed builder is the safer choice. See our cost guide.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

How long does it take to build a retaining wall?

A typical residential wall takes several days to a couple of weeks, depending on length, height, access and excavation. Approvals can add weeks before work starts.

What goes behind a retaining wall?

An ag pipe at the base, clean drainage aggregate wrapped in geofabric, and compacted backfill.

Can I build my own retaining wall?

Low garden walls, yes. Walls retaining real soil, over 600mm, or near boundaries, driveways or buildings should be built by a licensed builder.