A gabion wall is built from heavy-duty wire mesh baskets filled with rock. Stacked and tied together, the baskets act as one heavy, flexible, free-draining wall. They have gone from road batters and riverbanks to some of the best-looking gardens in Sydney.
How a gabion retaining wall works
Gabion walls are gravity walls: their sheer weight resists the soil pushing behind them. Because rock-filled baskets let water straight through, water pressure does not build up behind them the way it can behind a solid wall. And because the mesh flexes, they tolerate small ground movements without cracking.
Where gabion walls suit best
- Steep and wet sites, where drainage is a constant problem.
- Large garden terraces that need a natural, textured look.
- Commercial and civil sites, batters and driveways.
- Erosion control along creeks and drainage lines.
- Feature walls, planters and seating with timber tops.
Gabion wall design
Base width
Gravity walls need a wide base. A common starting point is a base around half to two-thirds of the wall height, with the wall stepping back as it rises. Taller walls and walls carrying driveways or buildings need an engineer.
Foundation
Gabions sit on a compacted, level foundation, often a compacted crushed rock pad. Soft ground or fill must be removed or improved first.
Geotextile
Filter fabric between the baskets and the soil behind stops fine soil washing through the rocks.
Mesh and wire
Galvanised or galvanised and coated wire resists corrosion. Welded mesh gives a neater, square look; woven mesh is more flexible.
Rock fill
Hard, durable rock sized larger than the mesh openings, packed tightly so baskets do not bulge or settle. The face rocks are hand-placed for a tidy finish.
Common mistakes
- Bases that are too narrow for the height.
- Building on soft ground without a proper foundation.
- No geotextile, so soil washes out over time.
- Loose fill that lets baskets sag and bulge.
- Thin or uncoated wire that rusts, especially near the coast.
Gabion kits and DIY
Gabion baskets are sold as kits for small garden walls. For anything retaining real soil, over about 600mm, or near boundaries and driveways, the base width, foundation and engineering matter too much to guess.
Gabion walls in Sydney
We design and build gabion retaining walls for homes, commercial sites and civil projects across Sydney, engineered and approved where required. See our concrete sleeper guide if you are comparing options.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Are gabion walls good retaining walls?
Yes. Their weight and free drainage make them very effective, especially on steep or wet sites, as long as the base width and foundation are designed properly.
How long do gabion walls last?
With heavy galvanised or coated wire and durable rock, gabion walls can last for many decades.
Do gabion walls need drainage?
They drain naturally through the rocks, but still need geotextile behind them to stop soil washing through, and a stable base.