Steel appears in almost every modern retaining wall in some form. Understanding where it is used, and how it is protected, helps you choose a wall that lasts.
Steel retaining wall posts
Galvanised steel H and C posts are the backbone of concrete sleeper and timber sleeper walls. H posts sit between bays, C posts at the ends and corners. Their size, depth and galvanising decide how long the wall lasts. See concrete sleeper walls.
Steel sleepers and panels
Galvanised or coated steel sleepers and panels slot between posts like concrete sleepers. They are light, fast to install and suit tight access, but need good corrosion protection where they touch soil.
Corten weathering steel
Weathering steel forms a stable rust-coloured surface layer. It is popular for modern garden walls, planters and edging. Points to consider:
- Run-off can stain paving and concrete below while the patina forms.
- It suits drier, well-drained situations better than permanently wet soil.
- Thicker plate and proper footings are needed for walls that retain real soil.
Corrosion protection
- Hot-dip galvanising for posts in the ground.
- Drainage so steel is not sitting in wet soil.
- Extra care near the coast, where salt speeds corrosion.
- Concrete footings that shed water away from the post at ground level.
Where steel suits
- Sleeper walls of all types (posts).
- Modern garden walls and planters (Corten).
- Tight-access sites where light materials help.
Steel and sleeper walls by METCON
We use hot-dip galvanised posts sized for the height on every sleeper wall. See also retaining wall design.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
What steel posts are used for retaining walls?
Hot-dip galvanised steel H posts between bays and C posts at ends and corners.
Is Corten steel good for retaining walls?
It suits modern garden walls and planters, but thicker plate, footings and good drainage are needed for walls retaining real soil.
How do you stop retaining wall posts rusting?
Use hot-dip galvanised posts, good drainage and concrete footings that shed water away from the post.