Retaining walls and garden beds go hand in hand. Raised beds turn slopes into planting space, define lawns and paths, and bring plants up to eye level.

Garden bed wall options

Drainage keeps plants and walls healthy

Garden beds are watered constantly, so they hold more water than ordinary retained soil. Drainage gravel and an ag pipe behind taller bed walls, and free-draining soil mix, protect both the plants and the wall.

Beds against the house

Garden beds built up against house walls are a common cause of damp and termite problems. Keep soil below the damp course and weep holes, or build the bed as a separate structure with a gap and waterproofing.

Design ideas

Approvals

Low garden bed walls are often exempt, but beds that retain significant soil, sit near boundaries or exceed 600mm may need approval.

Garden bed walls by METCON

We build garden bed walls that drain properly and last, from simple raised beds to terraced planting on steep blocks.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Do raised garden beds need drainage?

Yes. Beds are watered often, so drainage gravel, an ag pipe behind taller walls and free-draining soil protect plants and walls.

Can I build a garden bed against my house wall?

Avoid raising soil above the damp course or weep holes. Build the bed as a separate structure with a gap or waterproofing.

What is the longest-lasting garden bed wall?

Concrete sleeper, block, sandstone and gabion walls last much longer than timber.