Steel appears in almost every modern retaining wall in some form. Understanding where it is used, and how it is protected, helps you choose a wall that lasts.

Steel retaining wall posts

Galvanised steel H and C posts are the backbone of concrete sleeper and timber sleeper walls. H posts sit between bays, C posts at the ends and corners. Their size, depth and galvanising decide how long the wall lasts. See concrete sleeper walls.

Steel sleepers and panels

Galvanised or coated steel sleepers and panels slot between posts like concrete sleepers. They are light, fast to install and suit tight access, but need good corrosion protection where they touch soil.

Corten weathering steel

Weathering steel forms a stable rust-coloured surface layer. It is popular for modern garden walls, planters and edging. Points to consider:

Corrosion protection

Where steel suits

Steel and sleeper walls by METCON

We use hot-dip galvanised posts sized for the height on every sleeper wall. See also retaining wall design.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

What steel posts are used for retaining walls?

Hot-dip galvanised steel H posts between bays and C posts at ends and corners.

Is Corten steel good for retaining walls?

It suits modern garden walls and planters, but thicker plate, footings and good drainage are needed for walls retaining real soil.

How do you stop retaining wall posts rusting?

Use hot-dip galvanised posts, good drainage and concrete footings that shed water away from the post.