Waterproofing keeps moisture out of the wall. Drainage relieves pressure. One does not replace the other.
Walls that usually need it
- A wall forming part of a house, garage or cellar.
- Rendered or painted block walls, to limit staining and bubbling.
- Planter walls next to a building.
Walls that usually do not
Gabions and most sleeper garden walls are meant to drain. A membrane across them can be the wrong detail.
How it is done
- Prepare a clean, sound surface on the soil side.
- Apply a suitable membrane and treat joints and corners.
- Add protection board so backfill does not puncture it.
- Place drainage, gravel and filter fabric.
- Backfill carefully in layers.
Existing walls
The soil side may need excavation to treat it properly. Internal coatings are an option in some cases but do not dry the wall itself. See rendered block walls.
What gets missed most often
- The joint between the footing and the first course.
- The top edge, where water gets in behind the membrane.
- Pipes and conduits through the wall.
- Corners, laps and movement joints.
- Damage during backfilling.
Membranes usually fail at details, not in the middle of a wall.
Ask for these before it is covered
Photos, the product name, the number of coats or sheets, and confirmation that the surface and curing followed the manufacturer's instructions. For a wall that keeps a room dry, ask who is responsible for the waterproofing design as well as applying it.
If you already have a damp garage wall
Check where water comes from first. Downpipes, garden beds and paving above can often be changed without excavation. If the wall still leaks, the choice is between outside excavation, managing the water inside, or a combination.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Can I waterproof from the front?
It may limit damp on the face, but water stays in the wall and can lift the coating.
Does a membrane replace ag pipe?
No. Without drainage, water pressure still builds.
Why is my render bubbling?
Moisture and salts moving through the wall are a common cause.