In a sleeper wall, each post acts like an upright beam fixed in a concrete pier. It resists the soil pressure passed on by the sleepers.

Post types

What sets the size

Wall height, post spacing, soil, slope and loads above. A heavier post does not fix a shallow pier.

Corrosion protection

Hot dip galvanising is common. Cutting, drilling or welding after galvanising exposes steel, so it needs proper repair. Coastal sites need extra thought.

Installation points

See maximum sleeper wall height.

Signs a post is in trouble

Surface rust on its own is less serious than loss of steel at ground level, where bending is high and water sits.

Replacing posts under an old wall

The soil is usually supported in sections, sleepers are taken out, and new posts go between or beside the old ones. If many posts have corroded at the same level, a complete rebuild may be simpler.

Match the sleepers and posts

Sleeper thickness must suit the space in the flange. A loose fit rattles and lets sleepers tilt. A forced fit can chip the sleeper ends or damage the galvanising.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Can rusted posts be replaced?

Often yes, but the soil must be supported while it is done.

How deep do posts go?

It is an engineering question. Depth changes with height, soil and load.

Can a fence fix to the posts?

Only if the posts and piers were designed for wind load as well.