A crack is a symptom. The right repair depends on why it opened and whether it is still moving.

Reading the crack

Get help quickly if

Repair options

Track it

Photograph it with a ruler, date each photo and compare after rain. See bulging walls.

What an engineer looks at

They may ask for crack gauges or repeat photos, because a crack that has not changed for years is a different problem to one that opened last month.

Cosmetic repair after the cause is fixed

Movement joints should stay as joints. Rigid filler placed across them will crack again. Render needs to be cut back to sound edges, and paint should match the moisture condition of the wall.

When replacement is better

Replacement may be better if reinforcement is missing, the footing has rotated, the wall is bulging, or repairs need most of the soil excavated anyway. Ask for both options to be priced when the choice is close.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Can I fill it with mortar?

Only for cosmetic, stable cracks. Filler does not restore strength.

Is a hairline crack serious?

Often not, but note its location and watch whether it changes.

Can a cracked wall be saved?

Sometimes. Cause, reinforcement and movement decide.