A retaining wall does a structural job, but it can also be the best feature in the garden. These are the ideas we see work best on Sydney blocks.

Ideas for sloped backyards

Ideas for front yards

Planting ideas

Material ideas

Lighting

Step lights and strip lighting under capping make walls safer and look great at night. Plan the conduit before the wall is built.

Ideas on a budget

Concrete sleepers and timber sleepers are usually the most affordable. See the cheapest retaining wall options.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

What is the best retaining wall for a sloped backyard?

Often a series of terraced walls rather than one tall wall, in concrete sleeper, block or sandstone depending on budget and look.

Can a retaining wall be used as seating?

Yes. Walls around 450mm high with a wide capping make comfortable built-in seats.

What plants suit retaining walls?

Trailing and hardy plants such as native rosemary, grevillea, star jasmine and small native grasses.