A retaining wall does a structural job, but it can also be the best feature in the garden. These are the ideas we see work best on Sydney blocks.
Ideas for sloped backyards
- Terraces: two or three lower walls instead of one tall one, creating flat lawn, play and entertaining levels. See tiered retaining walls.
- Built-in seating: a wall at around 450mm high with a wide capping doubles as a bench.
- Steps between levels, built into the wall in the same material. See retaining wall steps.
- A flat lawn created by cutting and retaining the high side of the yard.
Ideas for front yards
- Low feature walls in sandstone or rendered block to lift the garden and frame the entry.
- Walls along the driveway that also hold planting. See driveway retaining walls.
- Wall plus fence: a retaining wall with a slatted fence on top for privacy. See fence on a retaining wall.
Planting ideas
- Raised garden beds behind low walls. See retaining wall garden beds.
- Trailing plants such as native rosemary, grevillea or star jasmine to soften hard walls.
- Hedges set back from the wall to hide the top edge.
Material ideas
- Sandstone for a classic Sydney look.
- Gabions for a modern, textured wall.
- Concrete sleepers in woodgrain or smooth finishes for a clean, budget-friendly wall.
- Rendered block to match the house.
Lighting
Step lights and strip lighting under capping make walls safer and look great at night. Plan the conduit before the wall is built.
Ideas on a budget
Concrete sleepers and timber sleepers are usually the most affordable. See the cheapest retaining wall options.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
What is the best retaining wall for a sloped backyard?
Often a series of terraced walls rather than one tall wall, in concrete sleeper, block or sandstone depending on budget and look.
Can a retaining wall be used as seating?
Yes. Walls around 450mm high with a wide capping make comfortable built-in seats.
What plants suit retaining walls?
Trailing and hardy plants such as native rosemary, grevillea, star jasmine and small native grasses.