A crack is a symptom. The right repair depends on why it opened and whether it is still moving.
Reading the crack
- Fine and even: often shrinkage.
- Horizontal: may mean the wall is bending under pressure.
- Stepped in block or brick: may mean footing movement.
- Vertical near an end or joint: may be shrinkage or a missing joint.
- Rust stained: reinforcement may be corroding.
Get help quickly if
- It is getting wider.
- One side sits forward of the other.
- The wall is leaning or bulging as well.
- A building, pool or driveway is close.
Repair options
- Seal stable, non-structural cracks.
- Inject suitable cracks where specified.
- Fix drainage or loads that caused it.
- Strengthen or rebuild sections.
Track it
Photograph it with a ruler, date each photo and compare after rain. See bulging walls.
What an engineer looks at
- Crack width, length and pattern.
- Whether the wall is out of plumb.
- Ground levels and loads above.
- Drainage outlets and wet areas.
- Signs of footing movement nearby, such as cracked paving.
They may ask for crack gauges or repeat photos, because a crack that has not changed for years is a different problem to one that opened last month.
Cosmetic repair after the cause is fixed
Movement joints should stay as joints. Rigid filler placed across them will crack again. Render needs to be cut back to sound edges, and paint should match the moisture condition of the wall.
When replacement is better
Replacement may be better if reinforcement is missing, the footing has rotated, the wall is bulging, or repairs need most of the soil excavated anyway. Ask for both options to be priced when the choice is close.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Can I fill it with mortar?
Only for cosmetic, stable cracks. Filler does not restore strength.
Is a hairline crack serious?
Often not, but note its location and watch whether it changes.
Can a cracked wall be saved?
Sometimes. Cause, reinforcement and movement decide.