The footing is the part of a retaining wall you never see, and the part that decides whether the wall stands up. Most leaning walls we are called to fix had footings that were too small or too shallow.

Types of retaining wall footings

Post footings

Concrete sleeper and timber sleeper walls sit on posts concreted into holes. The posts act as cantilevers, so hole depth and diameter matter. As a rough guide, post holes are often as deep as the wall is high above ground, or deeper on poor soils and surcharged walls.

Strip footings

Reinforced concrete strips under besser block, brick and concrete walls. The footing usually extends further on the heel (soil side) to resist overturning.

Levelling pads

Segmental block walls sit on a compacted crushed rock base rather than a concrete footing, with the lowest course buried.

Gabion bases

Gabions sit on a compacted, levelled base, with deeper or wider bases for taller walls.

Piers

On deep fill or steep sites, walls may need bored piers down to firm ground or rock.

What decides footing size

Reinforcement

Strip footings and core-filled block walls use steel starter bars tied into the wall, positioned to the engineer's design.

When you need an engineer

Walls over the exempt height, walls with loads above, and walls on poor ground need an engineer to design the footing. See when engineering is needed.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

How deep should a retaining wall footing be?

It depends on height, soil and loads. Post holes for sleeper walls are often at least as deep as the wall is high, and engineered walls follow the design.

Does a sleeper retaining wall need a footing?

Yes. The steel or timber posts are concreted into footings that hold the wall up.

Do block retaining walls need concrete footings?

Segmental blocks usually sit on a compacted crushed rock base. Core-filled besser block walls need reinforced concrete footings.