What goes behind a retaining wall matters as much as the wall itself. The right backfill drains water away and keeps pressure on the wall low. The wrong backfill holds water and pushes walls over.

The zones behind a wall

  1. Drainage zone: clean aggregate, often 20mm, immediately behind the wall, with an ag pipe at the base.
  2. Filter layer: geofabric between the gravel and the soil, so fines do not clog the drainage.
  3. General backfill: suitable, compactable fill behind the drainage zone.
  4. Capping layer: topsoil or a less permeable layer on top, shaped so surface water runs away.

Best backfill materials

Materials to avoid

Compaction

Backfill should be placed and compacted in layers, typically 150mm to 200mm at a time, using a plate compactor. Dumping fill in one go leaves voids that settle later. Heavy compaction right against the wall can push it out, so lighter equipment is used close to the face.

Drainage is part of backfill

See retaining wall drainage for ag pipe, outlets and drainage cell.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

What is the best backfill for a retaining wall?

Clean aggregate in the drainage zone immediately behind the wall, with compactable granular fill behind it.

Can I use clay as retaining wall backfill?

Not directly behind the wall. Clay holds water and swells, adding pressure.

How much gravel goes behind a retaining wall?

Usually a drainage zone a few hundred millimetres wide for the full height, with an ag pipe at the base.