Along Sydney boundaries, retaining walls and fences usually go together. Getting the fence on top of the wall right matters for safety, for the wall's strength and for approvals.

Ways to fix a fence to a retaining wall

Fence post brackets and sleeves

Steel brackets or sleeves fixed to the retaining wall posts hold the fence posts. They are common on concrete sleeper walls and avoid digging new holes behind the wall.

Extended retaining wall posts

The retaining wall's steel posts run higher than the wall and carry the fence directly. This must be designed in from the start, because the posts take wind load from the fence as well as soil pressure.

Separate fence posts behind the wall

Fence posts set in their own footings behind the wall. They must be far enough back, or designed so they do not load or undermine the wall.

Fences add load

A fence catches wind, and a solid fence catches a lot. That load goes into whatever holds the fence up. Bolting a tall solid fence to a wall that was not designed for it can crack posts or tip the wall.

Height and approvals

In NSW, both retaining walls and fences have exempt development limits, and when a fence sits on a retaining wall, the combined height and the location affect whether approval is needed. Corner blocks, front fences, heritage areas and bushfire zones have extra rules. Check your council's controls or the NSW Planning Portal before building, or ask us to check.

Pool fences on retaining walls

A retaining wall next to a pool fence can create a climbable step that makes the pool barrier non-compliant. Pool barriers must meet the NSW pool safety rules and AS 1926.1, so plan the wall and fence together.

Boundary fences and neighbours

For dividing fences, the Dividing Fences Act 1991 (NSW) generally has neighbours share the cost of a sufficient fence. Retaining walls are a separate question. See who pays for a retaining wall between neighbours.

Our approach

We design the wall and fence as one system: post sizes, brackets or extended posts, and footings sized for both soil and wind. See also concrete sleeper retaining walls.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Can you put a fence on top of a retaining wall?

Yes, using brackets, extended posts or separate fence posts, as long as the wall is designed to take the extra wind load.

Does a fence on a retaining wall need approval in NSW?

It depends on the combined height, location and your property's controls. Check exempt development rules or ask your builder.

Can a retaining wall affect a pool fence?

Yes. A wall near a pool barrier can create a climbable step, so the wall and pool fence must be planned together.