A retaining wall looks simple, but it is a structure fighting the weight of soil and water every day. Good design is what keeps it straight for decades.
The forces on a retaining wall
- Soil pressure: soil pushes sideways, and the pressure grows with depth, so taller walls face much more force at the base.
- Water pressure: saturated soil is heavier, and trapped water adds pressure of its own.
- Surcharge loads: anything above the wall, such as driveways, cars, pools, sheds, buildings or extra fill, adds load.
- Slope above the wall: sloping ground behind the wall increases the pressure.
Key design decisions
Wall type
Gravity walls (gabion, segmental block, sandstone) resist by weight. Cantilever walls (reinforced concrete, core-filled block, sleeper walls with posts) resist by their footing and reinforcement. The right type depends on height, space and load.
Footings
Footing depth and width are set by the height, soil bearing capacity and loads. Reactive clay, fill and rock all change the design.
Drainage
Ag pipe, clean aggregate, geofabric and weep holes. Designing out water pressure is the cheapest way to make a wall stronger.
Tiering
Two lower walls can replace one tall wall, but the upper wall must be set far enough back that it does not load the lower one. See tiered retaining walls.
AS 4678 and the Building Code
AS 4678 Earth-retaining structures is the Australian Standard for retaining wall design. The National Construction Code allows earth-retaining structures associated with buildings to comply by being designed and built to it. In practice, engineers use it to set loads, safety factors and materials.
When you need an engineer
- Walls over about a metre high.
- Walls on or near boundaries.
- Walls supporting driveways, pools, buildings or other walls.
- Poor ground: fill, soft clay, steep slopes or landslip areas.
- Walls that need a CDC or DA.
Design and approvals together
Low walls up to 600mm can be exempt in NSW if they meet the standards; taller walls usually need approval. See council approval for retaining walls.
Designed and built properly
We coordinate engineering and approvals and build to the design. See also how a retaining wall is built.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Does my retaining wall need an engineer?
Usually if it is over about a metre high, near a boundary, carrying loads such as a driveway, or on poor ground.
What is AS 4678?
The Australian Standard for earth-retaining structures, used by engineers to design retaining walls.
What is a surcharge on a retaining wall?
Any extra load above or near the wall, such as a driveway, car, pool, building or sloping ground, which increases the pressure on the wall.