On sloping Sydney blocks, a pool almost always needs retaining walls: to create a level pool area, hold back the slope above it, or support the pool on the low side.

Pools add serious load

A full pool is extremely heavy, and walls near it carry that weight plus the soil. Walls supporting or near a pool need engineering, and should be designed together with the pool's own structure.

Common pool wall situations

Pool fences and climbable zones

This is where many projects go wrong. NSW pool barriers must meet the pool safety rules and Australian Standard AS 1926.1, which include non-climbable zones around the barrier. A retaining wall, planter or step too close to the pool fence can act as a foothold and make the barrier non-compliant. Plan the wall and fence together, and check compliance before the certifier does.

Fences on top of pool walls

Where the pool fence sits on a retaining wall, the fence height is measured from the finished ground on the outside, and the fixings must be strong. See fences on retaining walls.

Drainage around pools

Pool surrounds shed water, and pool overflows need somewhere to go. Drainage behind walls and surface drainage around the pool keep water out of the backfill.

Finishes

Pool retaining walls by METCON

We build engineered walls for pools and coordinate with pool builders and certifiers. See also retaining wall steps.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Do retaining walls near a pool need engineering?

Yes. A pool adds significant load, and walls supporting or near a pool should be engineered.

Can a retaining wall make a pool fence non-compliant?

Yes. A wall or planter too close to the fence can act as a foothold within the non-climbable zone.

Can a pool fence sit on a retaining wall?

Yes, if the fence height, fixings and climbable zones comply with the pool barrier rules.