On sloping Sydney blocks, a pool almost always needs retaining walls: to create a level pool area, hold back the slope above it, or support the pool on the low side.
Pools add serious load
A full pool is extremely heavy, and walls near it carry that weight plus the soil. Walls supporting or near a pool need engineering, and should be designed together with the pool's own structure.
Common pool wall situations
- Cut side: a wall holding back the slope above the pool area.
- Fill side: a wall holding up the pool surround on the low side.
- Terraces: steps and planters between the house, pool and garden.
Pool fences and climbable zones
This is where many projects go wrong. NSW pool barriers must meet the pool safety rules and Australian Standard AS 1926.1, which include non-climbable zones around the barrier. A retaining wall, planter or step too close to the pool fence can act as a foothold and make the barrier non-compliant. Plan the wall and fence together, and check compliance before the certifier does.
Fences on top of pool walls
Where the pool fence sits on a retaining wall, the fence height is measured from the finished ground on the outside, and the fixings must be strong. See fences on retaining walls.
Drainage around pools
Pool surrounds shed water, and pool overflows need somewhere to go. Drainage behind walls and surface drainage around the pool keep water out of the backfill.
Finishes
- Sandstone and stone cladding for a resort look.
- Rendered block walls to match the house.
- Built-in seating and planters.
- Lighting in walls and steps.
Pool retaining walls by METCON
We build engineered walls for pools and coordinate with pool builders and certifiers. See also retaining wall steps.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Do retaining walls near a pool need engineering?
Yes. A pool adds significant load, and walls supporting or near a pool should be engineered.
Can a retaining wall make a pool fence non-compliant?
Yes. A wall or planter too close to the fence can act as a foothold within the non-climbable zone.
Can a pool fence sit on a retaining wall?
Yes, if the fence height, fixings and climbable zones comply with the pool barrier rules.