A retaining wall leaning forward is a wall losing its fight with the soil behind it. It rarely straightens itself, and the lean usually gets worse after heavy rain.

Why retaining walls lean

How serious is it?

Repair options

Fix the drainage

Excavating behind the wall to install drainage can relieve pressure and stop a lean progressing, if the wall itself is still sound. See retaining wall drainage.

Remove load

Relocating heavy items or reducing fill above the wall.

Replace posts and sleepers

On sleeper walls, failed posts can sometimes be replaced in sections with deeper footings.

Rebuild

Old timber walls, walls with rotten posts and walls built without footings or drainage are usually better rebuilt. It often costs less over time than repeated repairs.

What affects the cost

Height and length, access, whether the wall can be repaired or must be rebuilt, demolition and disposal, drainage, engineering and approvals. See our retaining wall cost guide.

Boundary walls

If the wall is on a boundary, talk to your neighbour early. See who pays for a retaining wall between neighbours.

Get it assessed

Send us photos showing the lean and the height, and we will tell you whether it can be repaired or needs rebuilding.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Can a leaning retaining wall be pushed back?

Pushing it back without fixing the drainage, posts or footings rarely lasts. The cause must be fixed.

Is a leaning retaining wall dangerous?

It can be, especially if the lean is increasing, the wall is bulging, or it is above a path, driveway or neighbour.

Should I repair or replace my leaning retaining wall?

Sound walls with drainage problems can sometimes be repaired. Rotting, undersized or unfounded walls are usually better rebuilt.