Retaining walls beside driveways are some of the hardest-working walls on a property. They carry vehicles, take runoff from hard surfaces and are often the first thing visitors see.

Vehicle loads change the design

A car or truck near the top of a wall adds a surcharge load that a garden wall is not designed for. Driveway walls almost always need engineering, heavier posts or reinforcement and deeper footings.

Best wall types for driveways

Sloping driveways

Walls along a sloping driveway step down with the grade. Planning the steps in the wall top, and where they align with the driveway, makes the difference between a neat and an awkward result.

Drainage

Driveways shed a lot of water. A grated drain at the base of the driveway, drainage behind the wall and surface drainage at the top of the wall keep water away from the backfill.

Entrance walls

Council and the crossover

The section of driveway on the footpath belongs to council and has its own levels and rules. Walls near the boundary and footpath may also need approval.

Driveway walls by METCON

We design driveway walls for the loads they carry and finish them to suit the house. See also when walls need engineering.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Does a retaining wall next to a driveway need engineering?

Almost always, because vehicles add load near the top of the wall.

What is the best retaining wall for a driveway?

Reinforced concrete or core-filled block for loaded walls, often clad or rendered for looks.

How do you drain a driveway retaining wall?

Drainage behind the wall, surface drainage at the top, and a grated drain at the base of the driveway.