Concrete sleeper retaining walls, also called cement sleeper walls, are now the most popular retaining wall in Sydney. They combine the speed of a sleeper wall with the durability of concrete, and come in finishes that look like timber, stone or smooth concrete.

How a concrete sleeper wall works

Reinforced precast concrete sleepers slot between galvanised steel posts set in concrete footings. The sleepers hold back the soil; the posts carry the load into the ground. Ag drainage and gravel behind the wall relieve water pressure.

Finishes

Why they are so popular

What separates a good wall from a cheap one

Post size and galvanising

Heavier H and C posts for taller walls, hot-dip galvanised to resist corrosion at ground level.

Footings

Concrete footings deep and wide enough for the wall height, soil type and slope. Shallow footings are the main reason sleeper walls lean.

Drainage

Ag pipe, clean aggregate and geofabric behind every wall, discharging to a lawful outlet.

Sleeper quality

Sleepers rated for the span and height, with reinforcement suited to the load.

Heights and approvals

In NSW, low walls up to 600mm can be exempt if they meet the rules. Taller walls usually need a Complying Development Certificate or Development Application, and engineering. See council approval for retaining walls in NSW.

Fences on top

Many sleeper walls run along boundaries with a fence above. The fence posts need to be fixed properly, not just bolted to sleepers. See fences on retaining walls.

Concrete sleeper walls by METCON

Every wall we build has galvanised posts sized for the height, proper footings and full drainage. For prices, see our retaining wall cost guide.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Are concrete sleepers better than timber?

For most walls, yes. They do not rot or suffer termite damage and last much longer, for a moderate extra cost.

How high can a concrete sleeper wall be?

Height depends on post size, footing depth and engineering. Taller walls need an engineer and usually council approval.

What is a cement sleeper retaining wall?

The same as a concrete sleeper wall: precast reinforced concrete sleepers between steel posts.