A leaning wall tips as a whole. A bulging wall bends outwards, usually in the middle.
Common causes
- Water trapped behind it.
- Rotted or undersized sleepers.
- Posts too far apart.
- Missing reinforcement or ties.
- Extra load such as a driveway or fill.
- Tree roots.
How urgent is it?
Treat a new or growing bulge as urgent, particularly after rain. Keep people and cars away from the top and bottom until it is checked.
Can it be fixed?
- Replace failed sleepers if posts and piers are sound.
- Add drainage and reduce load.
- Strengthen where an engineer has a design.
- Rebuild where the main structure has failed.
Pushing a bulge back rarely works, because soil has moved in behind it.
Related guides
Leaning walls, tree roots and replacement.
Measure it safely
From a safe position at each end, sight along the wall or stretch a string between two fixed points. Note the distance at the worst spot, then repeat after rain. Do not stand directly below a tall or actively moving wall to take a measurement.
Timber walls
In timber sleeper walls, look for soft ends where sleepers meet the posts and for sleepers that have bowed between them. If only a few have failed, replacing them may help. If the posts have rotted at ground level, new sleepers will not solve it.
Block walls
A bulge in a block wall often means it lacks steel, filled cores or a connection to its footing. Those things cannot be seen from the front. Scanning or a small opening may show whether strengthening is realistic.
Before the next storm
Redirect roof water, clear outlets and remove weight from the top. These steps may slow it down, but they are not a permanent repair.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Will it collapse?
It can, and timing is hard to predict. Growing movement needs prompt assessment.
Can I prop it?
Only with a suitable temporary works design.
Is bulging always drainage?
No. Structure, loads and roots can cause it as well.