On a duplex or subdivision, one wall can affect two future owners. Getting it right on paper avoids disputes later.
Settle these early
- Finished levels on both sides.
- Where the new boundary sits.
- Who will own and maintain the wall.
- Where drainage goes and whether an easement is needed.
- Access for piers and excavation after the slabs are down.
Avoid these mistakes
- Building a footing across a future boundary.
- Draining one lot onto another.
- Fixing a fence to a wall not designed for it.
- Leaving walls until machine access has gone.
Best order
- Survey and soil information.
- Civil and wall design together.
- Approvals.
- Bulk dig, walls and drainage.
- Slabs, fences and landscaping.
See certification.
The price of changing levels late
Moving a slab up after walls are designed can make the wall higher, extend the driveway and change where stormwater falls. A small level change on one page can affect several trades. Freeze the key levels before ordering posts or forming footings.
Keep construction joints clear
If the duplex is built by one contractor and walls by another, agree where each starts and stops. Show excavation, drainage connections, backfill and compaction. "By others" on two drawings can mean nobody has priced it.
Documents for both owners
Give both lots the drawings, inspection records, drainage plan and information about loads near the top. Without these, the next owner may place a shed or pool against a wall designed for grass. If easements or shared maintenance apply, a conveyancer should explain them.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Who owns a wall on the new boundary?
Title, plans and agreements matter. Get surveying and legal advice before registering the lots.
Should walls be built before slabs?
Often, as access is better. The engineer must confirm the sequence.
Can one drain serve both lots?
Possibly, with the right design and easements.