Saturated soil is heavier and weaker than drained soil, and trapped water adds its own pressure. A wall that seems fine in summer can move after a wet week.
Warning signs
- Damp patches or white staining on the face.
- Leaning or bulging after rain.
- Soft, boggy ground along the top.
- Soil washing through gaps.
- No visible outlet, weep holes or pipe.
Can it be added later?
Sometimes. The usual options are:
- Digging out behind the wall in short sections to place gravel and pipe.
- Diverting surface water before it reaches the wall.
- Adding outlets through the face where the engineer agrees.
- Replacing the wall if it has already moved.
Digging behind a wall can change how it is supported, so take advice first.
Cheap first steps
Fix leaking downpipes, regrade garden beds away from the wall and clear blocked pits. See weep holes and bulging walls.
How to tell whether there is drainage
Look for an outlet at the low end, pits near the wall, weep holes and any old drawings. A small inspection hole behind the top may show gravel, or it may show clay right against the wall. Do not dig a deep hole next to a wall that is moving.
Replacement or retrofit?
Retrofitting makes sense where the wall is straight, sound and reachable from behind. It makes less sense when posts are rotten, the footing has moved or digging behind would undermine a fence, path or house. At that point much of the cost of replacement is already being spent on excavation.
Surface water is half the problem
Ground water gets the blame, but roof water is often the bigger source. A broken downpipe can put more water behind a wall in one storm than months of garden watering. Check the roof and paving drainage before paying for work on the wall.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Do all retaining walls need drainage?
Nearly all need a way for water to escape. How it is done depends on the wall type.
Will gravel alone do?
Gravel still needs an outlet, or it can fill like a bathtub.
Can I just seal the wall face?
Sealing the face can trap more water. It does not remove pressure.