"How high can I build without a permit?" and "how high before I need an engineer?" are two of the most common retaining wall questions. The answers are related but not the same.

The approval threshold

In NSW, retaining walls up to 600mm above existing ground level can be exempt development, but only if they meet every condition in the state's exempt development rules, including drainage, distance from boundaries and other walls, and not affecting neighbours. Taller walls generally need a Complying Development Certificate or Development Application. See council approval for retaining walls.

The engineering threshold

There is no single height that applies everywhere, but as a practical rule many builders and certifiers expect engineering for walls over about a metre. Australian Standard AS 4678, used for retaining wall design, covers walls from 800mm upwards.

Height is not the only trigger

A low wall can still need an engineer if it:

What an engineer designs

Building taller walls

Taller walls often suit reinforced concrete, core-filled block or engineered sleeper systems, or splitting the height into terraces. See tiered retaining walls and retaining wall design.

Do not build it taller than approved

Walls built over the limit without approval can attract council orders, cause problems when you sell, and void insurance if they fail.

We handle the engineering and approvals

We check your site's controls, coordinate the engineer and lodge approvals where needed.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

How high can a retaining wall be without council approval in NSW?

Up to 600mm above existing ground level can be exempt, if every exempt development condition is met.

At what height does a retaining wall need an engineer?

Commonly over about a metre, but lower walls carrying loads, near boundaries or on poor ground can also need engineering.

Can I build a taller wall as two smaller walls?

Often, if they are spaced far enough apart that the upper wall does not load the lower one.