The wall may be a narrow line on a plan, but the dig is wider. It must fit the footing, drainage and a safe work area.
Before digging
- Get service plans and locate pipes and cables.
- Mark the boundary.
- Check trees, footings and old structures.
- Plan temporary support.
- Put sediment controls in place.
Spoil
Loose soil takes up more space than soil in the ground. Some can be reused if it suits, but clay is often poor behind a wall. Soil that may be contaminated needs testing before it leaves.
Rock
Sandstone may need a hammer or saw. Agree rates and noise hours ahead.
Rain
Cover stockpiles, keep water away from the cut and inspect before anyone enters. See near house footings.
Estimating how much will leave
Work out the length, width and depth of the trench, plus the sloped or stepped edge needed for safety. Then allow for soil becoming looser after it is dug. Builders usually price disposal by truck or weight, so wet heavy clay can change the cost.
Reusing soil well
Suitable soil can fill low garden areas, provided it does not change drainage towards a neighbour or add load to the wall. Keep topsoil separate from clay. Drainage gravel should also be kept clean, because soil mixed into it reduces how well it drains.
Keep the street clean
Sediment must not wash into the street drain. Cover piles, sweep mud and place controls before rain. A tidy dig helps with neighbours too, as they see the truck and mud long before they see the wall.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Can spoil stay on site?
Sometimes, if levels, drainage and approvals allow it.
Is a deep trench dangerous?
Yes. Trenches can collapse without warning, so follow safe excavation rules.
Who pays if rock is found?
It depends on the contract. Check the exclusion and the rate.