Engineering is about matching the wall to the ground, water and loads. Height is only part of it.
When to involve an engineer
- The wall is around a metre or higher, or the approval pathway requires it.
- A driveway, building, pool or fence sits near the top.
- The ground slopes up behind the wall.
- The wall is near a boundary or an existing footing.
- The soil is fill, soft clay or very wet.
What the engineer needs
- Survey levels and boundary position.
- Soil information, sometimes a geotechnical report.
- What will sit above the wall now and later.
- Where water can discharge.
What drawings should show
- Wall height, footing or pier size and depth.
- Post, reinforcement and concrete details.
- Drainage, backfill and outlet details.
- The loads allowed behind the wall.
Inspections
Engineers often inspect pier holes or footings before the concrete is poured, then reinforcement and drainage. Work covered up before inspection may have to be opened. See wall certification and height before engineering.
Questions to ask before engaging an engineer
- Does the fee include a site visit?
- Is soil testing extra, and is it needed here?
- How many construction inspections are included?
- Will you provide the certificates my certifier wants?
- What happens if the ground is different when we dig?
Why the ground can change the design
Drawings make assumptions about soil. If the pier hole reveals fill, soft clay, water or rock at a different level, the builder should stop and ask. Carrying on and hoping is how walls end up with piers that are too short for the ground they are in.
Design before quotes
Quoting without drawings forces each builder to guess the posts, piers and drainage. With a design in hand, the prices are for the same wall and the cheapest one is less likely to be cheap because something was left out.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Does every retaining wall need an engineer?
No. Very low garden walls often do not. Loads, slopes and boundaries can mean a low wall does.
Can one design be used on any site?
No. Standard designs only apply within their stated soil, height and load limits.
Who arranges the engineer?
Either the owner or the builder. Make sure the quote says which.