Most arguments about retaining walls start with two unknowns: where the boundary is and why the wall is failing. Answer those first.
Step 1: find the boundary
A fence is not proof of the boundary. A registered surveyor can mark it and show which land the wall and footing sit on.
Step 2: find out what it supports
A wall may hold up the higher land, or fill placed on one property, or it may support a cut made on the lower property. This history matters.
Step 3: find the cause
An engineer can look at drainage, loads, tree roots and construction. Photos and old approvals help.
Step 4: talk and write it down
- Share reports and photos.
- Agree on a scope before talking about money.
- Record access, reinstatement and timing in writing.
The legal side
NSW law includes a duty of care about support of neighbouring land, and the dividing fences rules do not treat every retaining wall as a fence. Facts decide the outcome, so get legal advice. Community mediation can be a cheaper first step. See who pays.
What to put in a written agreement
- A plan showing the boundary and the new wall.
- The design and the drainage outlet.
- Who pays what, and when.
- Access days, hours and reinstatement of gardens, paving and fences.
- Who looks after the wall later.
Keep evidence, not arguments
Save dated photos, emails, survey plans and reports. Avoid long text message debates about blame. A neutral engineer's report addressed to both owners can be more helpful than two reports that each take a side.
If the wall is dangerous
Safety does not wait for agreement. Keep people away, tell your neighbour in writing and contact council if there is a risk to people or property. Urgent support work can be discussed separately from who pays in the end.
Before you dig on your side
Excavating near the boundary can affect the neighbour's land. Get the engineering done first, even if you are confident the wall is yours.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Do neighbours always split the cost?
No. There is no automatic 50/50 rule for every retaining wall.
Can I repair a wall on my neighbour's land?
Not without permission or an order. Agree on access in writing.
Who pays for the survey?
Usually the person who orders it, unless you agree to share.