A front yard retaining wall is the first thing people see. On a sloping block it also creates usable garden space and stops soil washing onto paths and driveways.
Design ideas
- Match the house: rendered block to match rendered homes, sandstone for older homes, face block or concrete sleepers for modern homes.
- Terraced garden beds on steeper front slopes.
- Integrated letterbox, house number and lighting.
- Steps from the street to the front door built into the wall.
- Planting to soften the wall from the street.
Walls with fences on top
Many front walls have a slatted or pool-style fence above. Fence posts must be designed into the wall, and combined heights may need approval. See fences on retaining walls.
Front yard slopes
- Sloping up from the street: a wall at the front boundary or set back creates a flat lawn.
- Sloping down from the street: walls beside the driveway and paths hold up the access. See driveway retaining walls.
Council considerations
Front boundary walls can affect footpaths, sight lines for driveways and the streetscape. Some councils have extra controls for front fences and walls. See council approval for retaining walls.
Cost factors
- Length and height.
- Premium finishes such as sandstone or render.
- Fences, gates, letterboxes and lighting.
- Drainage to the street or stormwater.
See more retaining wall ideas.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
What retaining wall suits a front yard?
One that matches the house: sandstone for older homes, render or face block for rendered homes, and concrete sleepers for a clean modern look.
Can I put a fence on a front retaining wall?
Yes, if posts are designed into the wall. Combined heights may need council approval.
Do front yard retaining walls need approval?
Low walls are often exempt, but front boundary walls can have extra council controls, so check before building.