A make safe buys time. It reduces the danger while the permanent wall is designed, approved and built.
Signs it is urgent
- The wall has moved suddenly or is still moving.
- Cracks have opened in the ground behind it.
- Soil is falling through or over the wall.
- A building, pool, driveway or path sits close to it.
Typical steps
- Fence off the area above and below.
- Stop water running to the wall: redirect downpipes, turn off irrigation and cover exposed soil.
- Take load off the top, such as parked cars and stacked materials.
- Install props, bracing, a soil berm or other support as the engineer directs.
- Monitor movement until the permanent work starts.
What not to do
- Do not prop a wall by guesswork. A prop in the wrong place can push it over.
- Do not dig at the base to look at the footing.
- Do not treat the temporary support as the repair.
Next step
Once it is stable, the cause can be investigated. See retaining wall collapse and leaning walls.
What to tell the builder or engineer
A short, accurate description helps them decide how fast to come and what to bring:
- Approximate height and length of the wall.
- What sits above and below it.
- When it moved and whether it is still moving.
- How a person and a machine could reach it.
- Photos from the front, the side and along the top, taken from a safe place.
Paying for emergency work
Make safe work is often charged by time and materials, because the extent is not known at the start. Ask for a daily or hourly rate, what is included and who approves further spending. If insurance may apply, ask the insurer whether it needs to approve the work first, and keep every receipt and photo.
When it is over
Do not remove fencing or supports because the weather has cleared. The person who designed the support should confirm when it can come out.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
How long can temporary support stay?
Only as long as the engineer allows. It is designed for a limited time and needs checking.
Do I need an engineer for a make safe?
For anything of real height, or near a building or boundary, yes.
Can it be done in the rain?
Some steps can, such as fencing and diverting water. Working below an unstable wall in rain may be too dangerous.