Commercial walls support roads, loading areas, car parks and buildings. The design and program need to fit the wider project.
Decide early
- Final levels and drainage.
- Vehicle and building loads.
- Boundary and easement limits.
- Temporary and permanent support.
- Appearance and maintenance.
Common systems
- Reinforced concrete and core filled block.
- Gabion and mass block.
- Concrete sleeper with steel posts.
- Soldier piles and anchored walls.
Program risks
Ground conditions, service clashes, wet weather, inspection hold points and crane or piling access.
Documents to ask for
Inspection and test plans, concrete results, drainage photos, compaction results where specified and as-built information.
Related
Cantilever walls, gabion width and duplex and subdivision walls.
Coordinate before construction
Retaining walls cross the work of several consultants. The civil drawing sets levels, the structural drawing sets the wall, the landscape plan may add weight above and the hydraulic plan needs pipe space. Overlay them before pricing. Many variations start as a pipe that runs through a footing.
Compare whole of life cost
The lowest construction price is not the only number. Consider cleaning, graffiti removal, drainage access, corrosion and how damaged panels are replaced. A system that keeps a lane open during repair can also have value.
Safety around finished walls
Falls from the top must be considered. Barriers, landscaping and maintenance access need to be designed together, because a later fence can affect the structure. Settle who checks and maintains drains after handover.
Get your free retaining wall quote
Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.
Request Free QuotationFrequently Asked Questions
Which wall is best for a car park?
It depends on height, vehicle load, space and drainage. Compare options with the engineer.
Can walls be staged?
Yes, if temporary edges and drainage are designed.
Who is responsible for temporary support?
The contract should say. Do not leave it unclear.