A cantilever wall has a reinforced upright stem joined to a wide base. The shape is often an L or upside down T.

How it works

Soil sits on the heel of the base. Its weight helps stop the wall from sliding or tipping. Steel in the stem resists bending.

When it suits

When it may not

A wide heel means digging further back. Near a boundary or building there may be no room. See soldier piles.

Key stages

  1. Excavate and support the cut.
  2. Prepare the base and fix footing steel.
  3. Pour the base with starter bars.
  4. Form and pour the stem, or use core filled block.
  5. Waterproof, drain and backfill as specified.

Check these before the pour

  1. The footing is at the right level and on suitable ground.
  2. Steel size, spacing and laps match the drawings.
  3. Cover to the steel is correct on the soil side.
  4. Joints and waterproofing are in the planned positions.
  5. The engineer has inspected, where required.

Propping and backfill

A fresh stem is not ready to hold soil. Backfilling early, or running a heavy machine close behind it, can crack it on day one. Drawings should state the strength or age needed and whether the wall must be braced.

Finishing options

Exposed concrete needs good formwork and careful vibration. Block stems can be rendered, and either can be clad in stone. Allow for the thickness of cladding and its support before the footing is set out.

Get your free retaining wall quote

Talk directly with Constantine, the builder. Free site assessment and an itemised quote within 24 hours.

Request Free Quotation

Frequently Asked Questions

Which side does the main steel go?

The drawings show it. Placing it on the wrong face can seriously weaken the wall.

Can it be built from blocks?

Yes. Reinforced core filled block can form the stem.

Does it need weep holes?

It needs drainage. That may be weep holes, pipe or both.